Last week, the final segment of our concrete floor was poured. You can see that the front of the shop is the lowest point (ideal for a no-step entrance), followed by a short ramp for restroom entry and three steps after that for admittance to the kitchen.
This week is all about demolition. We're tearing down the exterior walls on the front of the building to make way for the incoming wrap-around window.
To maintain structural integrity in the face of, uh, wall-lessness, the roof of the building has been shored with a lattice of temporary beams.
Don't worry about the old walls -- they seem to be pretty happy about the prospect of being eradicated.
I don't know about you guys, but I for one am really excited to see this orange stucco get smashed to pieces.